One Crane, Two Forklifts, and a 30,000 Pound Machine: Rigging the Boulter Way

There is a certain finesse required to complete a rigging job in the highest quality possible.  Manufacturing machines aren’t simple moves either: they’re bulky and oddly-shaped.  But those large, heavy machines are a huge investment to our clients; therefore, we take extra precautions to make sure the job is done correctly and with the highest caliber work possible.

To give you a better idea of what’s involved, one of yesterday’s rigging jobs called for two forklifts and one crane to unload and move a 30,000 pound machine.  After lifting the crate off the truck bed, our employees went to work disassembling the crate and unpacking the cargo.job 8.5

20150805_113312

Then they used the Hyster 15-Ton to move it closer to the crane for offloading from the skid.

Finally, all that was left was to move it into the shop.20150805_113717

Does your company have something impossibly heavy to move? Give us a call… we make the impossible possible! 

Visit our website: http://www.boulter1.com

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s