No Boiler Too Complex for Boulter

RDH9A mechanical contractor came to us looking for assistance with a boiler replacement job, complete with new catwalks, rails and access ladders, for Rochester District Heating. Boiler replacements are typically complex projects, but this particular project was especially challenging since we were working against aggressive time constraints and the project had multiple components. Our customer’s goal was a safer, more effective boiler system. The challenge? Deliver a safe and secure system, on time and on budget.

 What was our pathway to success?

RDH3In order to successfully meet our customer’s timeline, we carefully scheduled each component so that our processes would coordinate with the demolition. And because we uniquely offer all the needed services under one roof, we were able to complete the project on time and on budget. It all comes down to the Boulter promise of creating the product that our customer needs.

Our OSHA-trained crews and Qualified Riggers can safely install any machinery with ease. Our expert personnel were able to complete this job quickly, on time, and ultimately deliver the safe and secure system that our customer needed.

 How did it all come together?RDH5

The end result was exceptional. Our customers were thrilled because despite the complexity of the project, there have been no injuries onsite. We implemented the appropriate measures so that their employees can do their jobs safely, and the system could be prepared to supply heat before the cold weather hit. Thanks to their new Boulter support steel, handrail, access ladders and updated grating, Rochester District Heating was able to get back to business.

Visit our Project Gallery to find out more about other types of jobs we’ve done in the past.

Western New York’s Sonar Test Facility

Did you know the Navy does field tests in the Finger Lakes?

Our glacier-made lakes are perfect for the research and development the facility conducts, which is world-renowned for ventures that demand deep-water testing. Because it is capable of handling systems, or equipment, weighing up to 200 tons and as deep as 500 feet, many major projects get evaluated there. Also, the facility performs test and evaluation of equipment ranging from single element transducers to complex sonar arrays and systems.

Bsonaroulter was brought in by O’Connell Electric to assist in the replacement of the Test Facility’s entire ship-mounted MV and LV distribution systems. We received all the equipment, rig materials from land to the barge via crane, from the barge to the ship via the Navy’s ship-mounted crane. Once everything was on the ship, our crew rigged the equipment into its final location and the materials into place.

Our Fabrication Shop fabricated and installed new stainless steel bases for the exterior equipment. We also fabricated new stainless steel handrails to replace the existing fencing.

 

Learn more about typical projects we undertake here or read what others are saying about us.